- Installation Steps Helical extractors:
-
1. Drill a hole the same diameter as the screw extractor.
-
2.Install the fan coil at an angle looking to make a sweep of air in the warehouse.
-
3. Ensure equipment is well completely fixed using screws. There should be with misalignments and vibrations.
-
4.Verify that the inlet duct has adequate slope to prevent water seepage.
-
Remember a good installation
It is just a satisfied customer.
|
- Steps to install extractors Fungus:
-
1. Level the mushroom extraction equipment perfectly horizontally.
-
2. Install the extractor ms Hongo next to the easel to take full advantage of the surface wind.
-
3. Ensure the team perfectly with the appropriate structure depending on your model. There should be with misalignments and vibrations.
-
4. Install the extractor Hongo ms far as possible from the air intakes for this cool more effectively.
-
Remember a good installation
It is just a satisfied customer.
|
|